Natanebi HPP
A 1.95 MW run-of-river plant on a 116.5 m gross head.
THE THESIS
Natanebi HPP is a 1.95 MW run-of-river project by MES-VATTEN Energy, connecting to the 35/10 kV Dvabzu substation. A single Francis unit on a 110.5 m net head delivers an estimated 13.49 GWh a year at a 78.98% capacity factor.
GROUP
II — REAL ASSETS & ENERGY
LEAD ENTITY
MES-VATTEN ENERGY
MARKETS
Guria, Georgia
// PORTFOLIO COMPANY
MES-VATTEN ENERGY ↗
Natanebi HPP — 1.95 MW.
Run-of-river generation in Guria, connecting to the Dvabzu substation. Sub-2 MW: no licence, no ESIA, tariff secured for 15 years.
1.95 MW
Installed capacity
13.49 GWh
Annual output
78.98%
Capacity factor
4.0 MW
Site potential
TECHNICAL PARAMETERS
Head
Headwater 256.5 m and tailwater 140 m above sea level — 116.5 m gross head, 110.5 m net.
Turbine
Francis, single unit — 2.06 m³/sec rated discharge, 1.95 MW installed capacity.
Output
13.49 million kWh estimated annual output at a 78.98% capacity factor.
Pressure pipeline
4,300 m, OD 1600–1200 mm, max overpressure 30% of nominal.
Grid connection
0.5 km new 10 kV line to the 35/10 kV Dvabzu substation.